Solar First Group is pleased to present our latest instructional animation detailing the standardized installation process for Building Integrated Photovoltaics (BIPV) curtain wall systems.
The installation process demonstrated includes:
• Precise positioning and installation of embedded parts (chemical bolts, expansion bolts, or embedded bolts)
• Welding of base components—including corner and L-shaped bases—fitted with rubber padding for structural integrity
• Column installation featuring pre-assembled rubber strips and external angle compensation strips fixed with self-tapping screws
• Crossbeam installation with pre-installed rubber strips, mounted angle codes, and rear cover plates
• Secure thin-film module fixation using pressure seats equipped with rubber strips and self-tapping screws, followed by cover plate attachment
About Solar First Group:
As a national high-tech enterprise specializing in renewable energy, our credentials include:
✔ 6 invention patents and over 60 utility model patents
✔ 2 software copyrights
✔ ISO 9001, ISO 14001, and ISO 45001 certifications
✔ Recognition as a “Specialized, Refined, Unique, and Innovative” enterprise and a “Technology Giant” based in Xiamen
Our diverse portfolio—encompassing solar power generation systems, integrated smart energy solutions, trackers, floating PV, BIPV, and flexible mounting structures—has been deployed in more than 100 countries.
leave a message
Scan to wechat :