01 Product Description
The SF single-layer cable flexible support system adopts a pre-tensioned cable structure to achieve a large-span layout of 20 meters in a single span, creating a 6-meter high clearance to meet the combined needs of agriculture and breeding. Compared with fixed supports, it saves 20% of the foundation usage and 30% of the steel. It is perfectly adapted to complex terrains such as mountains, deserts and ponds, and has passed the national standard GB50017-2017 steel structure certification.
✅ Large-span economic design
• Single span 15-20 meters (half-string component layout)≥6 meters of working spaceThe multi-point drive design enhances the critical wind speed
• 45m/s limit wind speed certification (ASCE 7-10)
✅ High headroom composite utilization
• ≥6 meters of working space
• Support the simultaneous implementation of agricultural planting and livestock breeding
✅ Material cost optimization
• Steel usage is reduced by 30% (about 20 tons per MW for fixed supports)
• Reduction in basic costs (PHC piles/cast-in-place piles)
✅ All-terrain adaptability
• Mountains, hills, deserts, ponds, irregular terrain
• Slope adaptability: Inclination Angle ≤30°
02 Accessory schematic diagram
03 Product Components
04 Core Engineering Parameters
Key indicators | Parameter details |
Installation | Ground |
Foundation | PHC/Cast-in-place Pile |
Modules Layout | Single Row in Portrait |
Single span | ≤20 m |
Wind Load | 0.45KN/m² (Adjustable according to the project) |
Snow Load | 0.15KN/m² (Adjustable according to the project) |
Tilt Angle | ≤30° |
Standards | ≥65μm |
Drive System | GB 50009-2012, GB50017-2017, NB/T 10115-2018, JGJ257-2012, JGJT 497-2023 |
Material | Anodized Aluminum AL6005-T5, Hot Dip Galvanized Steel, Zn-AlMg pre-coated steel,Stainless SteelSUS304 |
Warranty | 10 Years Warranty |
05 Industry Application Scenarios
✔ Reservoir/fishpond surface photovoltaic
✔ Complex slope power station
✔ Mine restoration area
✔ Sewage treatment plant
06 Professional technical services
▶ Scheme design and structural analysis:
Provide customized load calculation reports (including wind load/snow load/seismic force analysis).
▶ On-site exploration support:
Engineers conduct on-site investigations of geological conditions (soil bearing capacity/slope/corrosive environment).
▶ Installation training and guidance:
Provide standardized installation videos, operation manuals and on-site technical guidance to ensure zero error in construction.
07 Technical verification system
Provide standardized installation videos, operation manuals and on-site technical guidance to ensure zero error in construction.
07 Technical verification system
▶ Extreme environmental testing
• Pass the low-temperature impact at -40℃
• Salt spray corrosion (3,000 + hours)
• Extreme tests such as 60m/s hurricane simulation.
▶ Third-party certification
• We hold wind pressure, snow pressure, seismic resistance and material certification certificates issued by TUV, SGS and other institutions to ensure the compliance of global projects.
08 Packages & Shipping
International standard packaging; Goods are dispatched from Shanghai, Ningbo, Tianjin, Xiamen and Shenzhen ports in China.
09 Project Case
leave a message
Scan to wechat :